QUBES will have scheduled maintenance work on Tuesday, December 17, 2024, beginning sometime between 5 pm PST and 11:59 pm PST, with downtime lasting approximately 30 minutes. All running tool sessions will expire during the maintenance window. Please plan accordingly and we do apologize for any inconvenience. close

Resources

Text Search:
Applied Filters
    Article or Presentation
    212

    views

    76

    downloads

    0

    comments

    1994-Brian_Winkel-Ant_Tunnels_and_Calculus
    A simple mathematical model describing the time it takes for an ant to construct a linear tunnel of length x is produced from five intuitively acceptable assumptions.
    Modeling Scenario
    943

    views

    1019

    downloads

    0

    comments

    1-007-AntTunnelBuilding-ModelingScenario
    We pose the prospect of modeling just how long an ant takes to build a tunnel. With a bit of guidance students produce a model for the time it takes to build a tunnel of length x into the side of a damp sandy hill.