QUBES will have scheduled maintenance work beginning on Wednesday, June 26, 2024, 4pm ET/1pm PT. The platform will operate normally for most of the day, except for an extended outage period lasting no more than 4 hours. All running tool sessions will expire during the maintenance window. Please plan accordingly and we do apologize for any inconvenience. close

Text Search:
Applied Filters
    2009-James_May-Nonlinear vibration control of long flexible structures
    An automated, non-linear control scheme was developed to transfer energy from the fundamental vibration mode, where most vibration energy of the structures of interest resides, to higher order...
    107

    views

    35

    downloads

    0

    comments

    0

    adaptations

    9-015-UnearthingTruth-ModelingScenario
    This project introduces \textit{electrical resistivity tomography}, a technique of interest for geophysical imaging, used to produce images of underground features or structures by using electrical...
    183

    views

    179

    downloads

    0

    comments

    0

    adaptations